Monday, January 30, 2006

22. Before and After - preview
























Here's a before and after comparison preview, before countertop is put on...
















After

21. Almost done


Getting the quote for the countertop, otherwise, it's almost done!

Sunday, January 22, 2006

20. Temporary sink and kitchen



One more pic of the stainless steel panel. Looks good.



The sink is up and usable.

19. Steel panel


The wiring behind the cabinet looks like this.



Put on the stainless steel panel on the side cabinet.
I have to drill a 1.5 x 3 inch hole to let the electric panel out.

18. Behind the cabinets

Have to cut the back panel to let the pipes into the cabinet

17. First cabinet up

16. Molding


After putting on the molding, the new wall looks pretty good!

15. Dirty fridge


This is the panel underneath our fridge.
Check yours at home. Please.

14. Floor done


After the 3rd night. The floor is finally done.

13. Floor - night 2


Anoter late night putting down the laminates.

12. Laying the floor





















A day's work, a bit more than 1/3 of the room is laminated.

Saturday, January 14, 2006

11. Ready for the floor


Ready for laying down the bamboo laminate tomorrow.

10. Painting

It's painted.
Two gallons of white paint.

9. Steve the plumber


Had Steve the plumber come in and put in new valves. He did a good job.
I patched it up with dry wall panels.

8. Wall Extension completed


After putting on a 1/4 inch dry wall panel, the wall is completed.

7. Building a new wall extension

Rebuilding a complete wall is not necessary, we just need an extension.
Without it, about 18 inch of the wall cabinet will stick out without support.

Building a new wall is pretty easy. Here's the frame.

Monday, January 02, 2006

6. Day 2: Knocking down wall cabinets




All the wall cabinets are knocked down.
Discovered that the wall behind the cabinets are all drywalls. We plan to erect a new, more sturdy drywall with a wood frame.

Remember the old wiring in the rangehood: black to black, yellow to white.

5. Day 1 - New Year's Day



A couple of hours work on new year's day to knock down all the moldings... and an accident happened while doing it.